The Electromagnetic Fountain

Day 2 at Frank’s place

leave a comment »

This post is more of a memory aid for me to remember what goes where in the fountain base as the bottom plates will shortly be put on. It is also the last chance to take a look at the open base and its design on the inside, and from above. We are still waiting for the sniffers to arrive from Berlin, and the dmx switch box to arrive from England.

Here’s 2 photos of the fountain base at the start of day 2:

Inspection 2 pumps
The 2 pumps have been bolted in place in their chamber on the top of the base (which is still upside down).

Wiring Bars in place
L: Marius threads the electric cables through holes from chamber to chamber.
R: Frank has soldered the metal bars on the bottom of the base in place.

Top view Water Power

L: The last view of the base construction before the bottom panels are put in place.
R: In the break Frank demonstrates how to get power out of electromagnetically charged water.

Central water tube hole Water tube holes

L: Hole for the central pump/jet water tube.
R: 5 holes for the 5 solenoid valve/jet water tubes

Power in Light holes

L: The hole for the electric power supply to the central jet pump.
R: 8 holes for the electric cables that lead from the rgb control boxes to the 8 underwater led lights.

Pump cables 01 Valve cable holes

L: Pump cables.
R: Solenoid valve cable holes.

Tubes in Tube fixture Tube fitting detail

L: Frank installs the water tubes that will carry water from the pumps to the 5 solenoid valves and central nozzle.
C: Water tube/pump fixture.
R: Water tube fitting.

Panel Atle, Frank and solenoid valves

L & R: The first base bottom panel is in place on the bottom of the fountain base, covering the computer/dimmer/rgb controller/ sound interface chamber. Atle Barcley (on the left) writing down the things he has to buy for tomorrow.

Chamber Pump and valves

L. The chamber for the electrical components with base and lid. The parts are being screwed in place, and electric cabling drawn threw holes from chamber to chamber.
R: The water tubes run from the solenoid valves the central hexagon chamber. They will be drawn out of corresponding holes on the bottom of the fountain bowl and feed the 5 pentagon nozzles.

Dismantled LAN box Father and Son

L: I am a bit distraught when I see Marius has dismantled my LAN box, but I’m sure he has a good reason.
R: At the end of the day Frank’s son, David, arrives to check out his dad’s work.

I think that we will be running a bit behind our schedule. The aim was to get the fountain construction finished by Thursday and transport it to an old warehouse at Klosterøya to test it with water in it. However, the fact that the dmx switch box is still sitting in the care of the customs officers in Oslo has put a damper on things ……. I’m a bit concerned about time running down the drain, but have decided not to panic and to keep relaed and confident about it all ….. hmmmm.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: